Root factors limiting BIM implementation in developing countries: sampling the Turkish AEC industry
| dc.contributor.author | Tan, Seda | |
| dc.contributor.author | Gumusburun Ayalp, Gulden | |
| dc.date.accessioned | 2022-06-23T11:14:35Z | |
| dc.date.available | 2022-06-23T11:14:35Z | |
| dc.date.issued | JUN 2022 | en_US |
| dc.department | HKÜ, Güzel Sanatlar ve Mimarlık Fakültesi, Mimarlık Bölümü | en_US |
| dc.description.abstract | Purpose Despite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM remains at a beginner level in developing countries. To increase the level of BIM implementation, first, knowing the root factors that resist BIM implementation is necessary to know. Therefore, the objective of this study was to identify the factors that limit BIM implementation in developing countries, specifically in the Turkish Architecture, Engineering and Construction (AEC) industry. Design/methodology/approach A questionnaire was designed with 46 influencing causes (ICs) identified through a systematic literature review. In total, 141 survey results were returned from architects and engineers, and reliability analysis, exploratory factor analysis, and confirmatory factor analysis were conducted. Furthermore, a structural equation model (SEM) was developed to identify the root factors of BIM implementation. Findings Eight root factors affecting the prevalent use of BIM technology in the Turkish construction industry were determined and grouped into three categories based on BIM implementation level. Problems with the BIM transition process and a lack of management support are the most influential root factors limiting BIM implementation. Lack of incentives, lack of BIM education, bias regarding BIM technology and BIM-based software problems form the second group of root factors that have a significant effect. Awareness and lack of communication amongst stakeholders were identified as root factors that had a moderate effect. Research limitations/implications This study contributes to the knowledge body by revealing eight root factors limiting BIM implementation in the Turkish AEC industry which can be generalised to most developing countries. Therefore, the outcomes of this study may be used as a practical reference for future research aimed at improving BIM adoption in developing countries through governmental, educational, and managerial solutions. Originality/value Several studies have identified the challenges and barriers of BIM implementation in the construction industry using qualitative and quantitative analyses and projected the current state. Unlike previous studies, this study comprehensively and quantitatively determined the root factors that constrain the use of BIM in Turkey using exploratory factor analysis, confirmatory factor analysis, and structural equation modelling to present a structural model. | en_US |
| dc.identifier.citation | Tan, S., & Gumusburun, A. G. (June 10, 2022). Root factors limiting BIM implementation in developing countries: sampling the Turkish AEC industry. Open House International. | en_US |
| dc.identifier.doi | 10.1108/OHI-12-2021-0273 | |
| dc.identifier.issn | 0168-2601 | |
| dc.identifier.issn | 2633-9838 | |
| dc.identifier.orcid | 0000-0002-7989-5569 | en_US |
| dc.identifier.uri | https://doi.org/10.1108/OHI-12-2021-0273 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.11782/2584 | |
| dc.identifier.wos | WOS:000808064900001 | |
| dc.identifier.wosquality | Q4 | |
| dc.indekslendigikaynak | Web of Science | |
| dc.language.iso | en | |
| dc.publisher | OPEN HOUSE INT | en_US |
| dc.relation.ispartof | OPEN HOUSE INTERNATIONAL | |
| dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
| dc.rights | info:eu-repo/semantics/openAccess | en_US |
| dc.subject | Building Information Modelling (BIM) | en_US |
| dc.subject | BIM implementation | en_US |
| dc.subject | BIM adoption | en_US |
| dc.subject | Root factors | en_US |
| dc.subject | Structural equation modelling | en_US |
| dc.subject | Developing countries | en_US |
| dc.title | Root factors limiting BIM implementation in developing countries: sampling the Turkish AEC industry | |
| dc.type | Article |










